Boeing Whistleblower: Production Line Has “Enormous Volume Of Defects” Bolts On MAX 9 Weren’t Installed

L4sBot@lemmy.worldmod to Technology@lemmy.world – 337 points –
Boeing Whistleblower: Production Line Has "Enormous Volume Of Defects" Bolts On MAX 9 Weren't Installed - View from the Wing
viewfromthewing.com

Boeing Whistleblower: Production Line Has “Enormous Volume Of Defects” Bolts On MAX 9 Weren’t Installed::A reader at respected airline industry site Leeham News offered a comment that suggests they have access to Boeing’s internal quality control systems, and shares details of what they saw regarding the Boeing 737 MAX 9 flown by Alaska Airlines that had a door plug detach inflight, causing rapid decompression of the aircraft. The takeaway appears to be that outsourced plane components have so many problems when they show up at the production line that Boeing’s quality control staff can’t keep up with them all.

34

You are viewing a single comment

Boeing cut roughly 800 quality engineers from their staff in favor of “technology”.

“Some of you will die, but, that’s ok with us as long as we appease our capitalistic overlords” -Boeing

One source of many: https://www.heraldnet.com/business/boeing-revamps-quality-control-more-high-tech-fewer-humans/

2 more...